Independent new-build ledger, Ukraine

Compare new-build apartments on recorded facts, not brochure claims.

Every development is checked against the same four records: price per m², completion stage, document completeness and purchase terms. Each line carries the date it was verified.

Printed comparison ledger pages beside a marked-up apartment floor plan
Ledger extract · Verified 12 Feb 2025
City
Completion
Documents

No filters applied. All developments are shown.

Filters apply to the development ledger and to the documentation checklist.

Sortable matrix · Verified 12 Feb 2025

0 selected (max 3)

Compare Development Plans Terms
Riverstone QuarterKyiv, Podil $1,850 Q4 2026 6 of 6 · Complete 1–3 rooms, 42–118 m² 30% down, 24 months
Syrec HeightsKyiv, Syrets $1,620 Q2 2027 4 of 6 · Requested 1–2 rooms, 38–76 m² 20% down, 36 months
Lviv HallLviv, Center $1,410 Ready 5 of 6 · Needs review 2–4 rooms, 58–132 m² 15% down, 18 months
Odesa TerraceOdesa, Arcadia $1,290 Q1 2028 3 of 6 · Not provided Studio–3 rooms, 28–96 m² 25% down, 30 months

Verified 12 Feb 2025 · Documentation status is recorded, not rated. Methodology

02 / Floor plans

Plans printed with their numbers attached

Areas, room counts and efficiency notes are read straight from the developer's plan sheets. Each strip names the sheet it came from.

Verified 12 Feb 2025. The same date sits on every plan in the ledger.

See plan ranges across all developments

1 room

38.4 m²

Hall 9.1 m², no corridor to heat. Efficiency 78%.

Plan sheet

2 rooms

61.7 m²

Kitchen and living room share one wall. Efficiency 81%.

Plan sheet

2 rooms

74.2 m²

Corner unit with two exposures. Efficiency 84%.

Plan sheet

3 rooms

96.5 m²

Separate kitchen, 12 m² glazed loggia. Efficiency 86%.

Plan sheet
Printed apartment plan sheet lying beside a comparison ledger page on a desk
Illustrative photograph only. Dimensions come from the developer's drawing, not a site survey.
  1. 01

    Land title and ownership record

    Cadastral number, plot boundaries and registered owner in the development file.

    Evidence note
    CompleteVerified 12 Feb 2025
  2. 02

    Building permit and zoning approval

    Permit number, issue date and permitted use recorded against the project.

    Evidence note
    CompleteVerified 12 Feb 2025
  3. 03

    Design and structural package

    Architectural set, structural calculations and amendment history.

    Evidence note
    Partial 4/5Verified 18 Feb 2025
  4. 04

    Construction supervision reports

    Independent site inspection records for the current construction stage.

    Evidence note
    RequestedRequested 21 Feb 2025
  5. 05

    Developer financial statements

    Two most recent annual statements and current registered capital.

    Evidence note
    CompleteVerified 10 Feb 2025
  6. 06

    Reservation and purchase templates

    Standard reservation form, payment schedule and handover clause set.

    Evidence note
    Not providedRequested 21 Feb 2025

Status key CompletePartialNot provided

05 / Purchase terms

Purchase terms, compared line by line

Reservation fee, payment schedule, taxes and handover, recorded from each contract pack. Latest verification: 12 Feb 2025.

Open the full comparison ledger
Booking
10% within 3 days of reservation
Frame
30% at structural completion
Facade
25% after glazing and roof
Handover
35% on the acceptance act

Percentages reflect the published band. Verified 12 Feb 2025.

Section 06 / Verification

Verification note

Ledger currency:

Each row in the ledger records what we could check, the date we checked it, and the document it came from. Where a developer has not supplied a document, the row keeps the label we gave it and a note of the request date.

Method
Five comparison axes, four sourcing steps and a 90-day re-verification cycle. The full method sits at the end of the ledger page.
Funding
A referral arrangement exists with a subset of developers. It is disclosed in plain language and has no effect on ordering, scoring or inclusion.
Corrections
Send the document reference to [email protected]. Confirmed corrections are applied within five working days and the row carries a fresh verification date.
Scope
ulvixi.com is not the developer or the seller, holds no inventory, and does not provide legal, tax or investment advice.